Emerging Markets · 6 min read
Infrastructure Checklist for a New Exchange or Clearing Organization
What new DCMs and DCOs should decide about carriers, facilities and operations before the first participant connects.
Launching a regulated market involves a long list of legal, operational and technology workstreams. This article covers one of them: the physical and network infrastructure. It is not legal or regulatory advice.
First, be precise about what you are building
A designated contract market (DCM) is an exchange: the venue where contracts are listed and traded. A derivatives clearing organization (DCO) is a clearinghouse: it stands between counterparties, manages margin and settles. They are distinct registrations with distinct infrastructure priorities. A DCM's design is shaped by participant access and matching; a DCO's by settlement connectivity, risk systems and recoverability. A DCO being registered does not, by itself, mean any market it clears is trading.
Current registration status for both is published by the CFTC: see the clearing organizations registry and the trading organizations registry. Always check the source directly for current, dated status.
The checklist
Carriers and routes
- Primary and secondary carriers selected for physical separation, verified with route KMZs.
- Building entrances and risers reviewed at every site.
- DIA with BGP across diverse upstreams for internet-facing services.
Facilities
- Primary data center chosen for its carrier, cloud and participant ecosystem.
- Secondary site with real geographic separation from the primary.
- Rack, power and cross-connect capacity sized for growth, with lead times understood.
Participant and market-data reach
- How members, FCMs, data vendors and other venues will connect.
- Whether to offer colocation, cross-connects, extranet, cloud or internet access, and to whom.
Operations
- 24x7 coverage and maintenance windows appropriate for the trading hours you intend.
- Failover that is tested on a schedule, not just documented.
- A single owner for every circuit, contract, renewal and escalation path.
Not every new venue needs the same build
An event-contract exchange serving retail participants through apps may run largely in the cloud. A venue courting institutional market makers may need colocation and cross-connects in an established financial data center. A DCO may prioritize recoverability over latency entirely. The right architecture follows from the product, the participants and the risk tolerance — and those decisions are cheapest to get right before go-live.
